College “Rezonanca” has provided sufficient physical resources, human resources and modern laboratory and clinical equipment, which enable the long-term realization of the College’s accredited study programs.
Physical infrastructure of the College:
| Space | Area (m2) |
| Academic part of the College | 2319 |
| Hospital | 1500 |
| Drug Control Institute | 1600 |
| Additional Space, Academic Teaching Laboratories of the College | 4000 |
| Total | 9419 |
College Master Plan:
| Facilities | Area (m2) | Completion year |
| General Hospital | 18.000 | 2022 |
| Special Centre for Drug and Alcohol Abuse Rehabilitation | 3.000 | 2022 |
| Total | 21.000 |
LABORATORIES
| Destination | Area (m2) | |
| L1 | Pharmaceutica Technology Lab | 75.311 |
| L2 | Research Lab | 52.321 |
| L3 | Physiology Lab | 29.451 |
| L4 | Human Anatomy Lab1 | 50.81 |
| L5 | Emergency Medicine Lab | 29.451 |
| L8 | Microscopic Lab1 | 29.451 |
| L9 | Microscopic Lab2 | 42.341 |
| L10 | Microscopic Lab3 | 50.816 |
| L2-5 | Analytical Chemistry Lab | 34.807 |
| L1-6 | Chemistry materials and equipment depo | 28.256 |
| L2-7 | Organic Chemistry Lab | 31.364 |
| L2-1 | Physical Chemistry Lab | 28.256 |
| L2-2 | Community Pharmacy Lab | 49.328 |
| L1-3 | Microbiology Lab | 50.503 |
| DC1 | Dentistry Clinic 1 | 103.348 |
| DC2 | Dentistry Clinic 2 | 98.166 |
| DC3 | Dentistry Clinic 3 | 25 |
| DC4 | Dentistry Clinic 4 | 42.341 |
| S3 | Dental Lab 1 (Phantoms) | 49.328 |
| S4 | Dental Lab 2 (Phantoms) | 47.461 |
| S | Prosthodontics Lab 1 | 28.565 |
| A2 | Nursing Lab 1 | 71.216 |
| A3 | Nursing Lab 2 | 62.443 |
| A4 | Nursing Lab 3 | 35.47 |
| S11 | Physiotherapy Lab 1 | 58.625 |
| S12 | Physiotherapy Lab 2 | 63.864 |
| S13 | Physiotherapy Lab 3 | 45.511 |
| S14 | Physiotherapy Lab 4 | 63.437 |
| S24 | PC Lab | 63.075 |
| S25 | Electronic Library 1 | 104.982 |
| S35 | Electronic Library 2 | 75.536 |
| S44 | Electronic Library 3 | 74.501 |
| S45 | Library | 116.756 |
| KLINIKA | 1500 | |
| TOTAL | 3312.091 |